RO-6210-IS Straight Handrail – Solid Cap Wood Handrail

Select options

SKU: RO-6210-IS Category: Tags: , , , , Brand:
Guaranteed Safe Checkout

12 and 16 FT long piece of straight handrail. Comes in the 6210-IS profiles. Comes in the 6210-IS profile. Only rail and fittings that also say -IS in the part number will match up with this 6210-IS profile.

  • Straight Handrail
  • Industry Standard Profiles
  • Ready to Stain, Free of Knots and defects.
  • The solid cap means the top has up to one butt joint on the top of the handrail.

This must ship as heavy freight.

Wood handrail will contain some joints and is constructed in layers. This type of construction puts the grain going against each other in order to prevent potential future warping. All wood bends has the potential to bend and when it does it typically bends one single direction which is why virtually all handrail produced will have the construction method similar to ours and aims to prevent wood warping. Also many wood species simply do not come in these extreme lengths. Our handrail gets installed daily in custom and production homes with zero issues and stains beautifully.

Comes in the 6210-IS profile. Only rail and fittings that also say -IS in the part number will match up with this 6210-IS profile.

Skip the Freight Fee: Join Two 8 ft Rails

Handrail longer than 8 ft can't ship by regular ground service, so it ships by freight with a long-length fee that free shipping never covers. Order 8 ft rails instead and join them with our $3.61 S-9600 Rail Bolt Kit. It's the same hidden joint stair builders use, it takes about 20 minutes, and the bolt hole is underneath where nobody sees it.

What you save

Rail length you needLong-length fee for one pieceOrder this insteadLong-length feeFreight fee you save
12 ft$200Two 8 ft rails + 1 rail bolt kit$54About $142
14 ft$200Two 8 ft rails + 1 rail bolt kit$54About $142
16 ft$500Two 8 ft rails + 1 rail bolt kit$54About $442
18 ft$500Three 8 ft rails + 2 rail bolt kits$54About $439
20 ft$750Three 8 ft rails + 2 rail bolt kits$54About $689

The long-length fee is charged once per order, no matter how many 8 ft rails you order. "Freight fee you save" already takes out the cost of the rail bolt kits. Two or three 8 ft rails can give you more rail than you need (for example, 16 ft of rail for a 12 ft run), so compare the rail prices too. The savings are biggest at 16 ft and longer. Regular shipping still applies to the order. Need about 10 ft? A single 10 ft rail is usually the better buy, since an extra 8 ft rail costs about the same as the $125 fee.

What you need

  • S-9600 Rail Bolt Kit, one per joint. Includes the rail bolt, hex nut, spacer and a 1″ oak plug.
  • Rail Bolt Driver (S-9600-D), optional, makes tightening the nut much easier.
  • Drill with a 1/4″ bit, a 3/8″ bit and a 1″ Forstner or spade bit
  • Miter saw or a fine-tooth handsaw and a square
  • Wood glue, tape measure, pencil, 120 and 180 grit sandpaper

Before you buy, know this:

  • You will see a thin seam across the top of the rail. Sanded and stained, it's subtle, but it's there.
  • Only for straight runs. Don't splice bending rail or a rail that will be bent.
  • Plan the joint so it lands between balusters, not over a baluster hole, bracket or fitting.
  • Stain both pieces at the same time so the color matches.

How to join two rails

Joint here between balusters
Step 1

Plan the joint

Lay out your run and pick the joint spot: on a straight section, between two balusters, and at least 6″ from any fitting, newel or bracket. Cut both rail ends perfectly square so they meet with no gap.

End view: one center mark, same on both rails
Step 2

Mark the same center on both ends

Trace the rail end onto paper, cut it out and poke a hole in the middle. Use that one template on both ends so the holes line up exactly. This is what keeps the profiles flush.

Rail A half the bolt sticks out
Step 3

Set the bolt in Rail A

Drill a 1/4″ pilot hole straight into the center mark, as deep as half the bolt's length. Screw the wood-thread end of the rail bolt in until half of it sticks out, keeping it straight with the rail.

1″ access hole, from below 3/8″ hole Rail B
Step 4

Drill Rail B

Drill a 3/8″ hole into the center mark, a little deeper than the bolt sticks out. Then flip the rail over and drill the 1″ access hole in the bottom so it meets the end of that 3/8″ hole. Go just past the hole, never through the top.

spacer + nut
Step 5

Glue and tighten

Spread glue on both end faces and push the bolt into Rail B. Through the access hole, slide on the spacer, then thread on the nut. Tighten with the rail bolt driver until the joint pulls tight and the tops line up. Wipe off squeeze-out right away.

Bottom view: plug sanded flush, seam sanded smooth
Step 6

Plug, sand and finish

Glue the oak plug into the access hole, let it dry, and trim and sand it flush. Sand the seam with 120 then 180 grit until you can't feel it. The plug sits on the bottom, so the finished rail looks like one piece from above.

Questions about your layout? Send us your measurements through our free quote form and we'll tell you which lengths to order.

Weight 18 lbs
Length

16 ft

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Free Shipping Over $750Free ground shipping on parts orders to the lower 48 states.
Secure PaymentAll major credit cards and PayPal.
Call a Stair Expert(866) 727-9356, M–F 8a–3p CST, or get a free quote.
We Beat Competitors by 5%Send us a competitor quote and we'll beat it.